Energy & Natural Resources

From discovery to commerciality: evaluating the Eban-Akoma prospects and the way forward in Ghana’s upstream sector

Reading Time

7 mins (approx.)

Published

Illustration reproduced from the Edfields Natural Resource Journal

Introduction

Ghana’s upstream petroleum sector continues to evolve, marked by new discoveries and sustained exploration interest across its sedimentary basins. The Eban-Akoma prospects, as two significant offshore discoveries, represent the latest additions to Ghana’s petroleum story. As commerciality assessments move forward, the focus has shifted from mere resource identification to the real-world feasibility of full-scale exploration, development and production.

This paper narrows the discussion to the commercial viability of the Eban-Akoma fields and examines the key economic, legal, and policy dimensions that support the declaration of commerciality.

Economic Viability of the Eban-Akoma Discoveries

The core of any commerciality declaration lies in the ability of the project to generate economic returns that justify full field development. In essence, for an announcement of a declaration of commerciality to be made in respect of an oil field, the country should have completed an appraisal process that concluded that developing such fields will be economically viable. For the Eban-Akoma fields, preliminary economic models indicate a strong case for commercial viability based on projected recoverable volumes, infrastructure access, and Ghana’s stable fiscal environment.

Studies conducted following the discovery of the Akoma field indicate that the combined Eban–Akoma reservoirs could hold an estimated 500 - 700 million barrels of oil equivalent in place. This assessment is based on preliminary resource modelling. The declaration was submitted by the Joint Venture (JV) partners comprising Eni Ghana Exploration & Production Ltd, Vitol Upstream Tano Ltd, Woodfields Upstream Ghana Ltd, and GNPC Exploration & Production Company Ltd (Explorco) in collaboration with the Ghana National Petroleum Corporation (GNPC).

Even though operating expenditure (OPEX) is projected to be competitive due to the shared infrastructure model, the discoveries are in close proximity to existing infrastructure such as the Floating Production Storage and Offloading (FPSO) John Agyekum Kuffour and subsea tiebacks. This proximity reduces capital expenditure (CAPEX) significantly when compared to greenfield developments.

Moreover, Ghana’s Petroleum Revenue Management Act, 2011 (Act 815) and predictable royalty and tax regime (35% corporate tax, 5–10% royalty depending on the contract) provide clarity to investors as to the use, and roadmap for management of revenue from the fields. The economic case is therefore not just viable, but resilient according to industry experts.

Legal and Regulatory Context

The legal framework for petroleum exploration and development in Ghana is anchored in the Petroleum (Exploration and Production) Act, 2016 (Act 919), Petroleum Revenue Management Act 2011 (Act 815), Petroleum (Exploration and Production)(General) Regulations, 2018 (L.I 2359), Petroleum (Exploration and Production)(Health, Safety and Environment ) Regulations, 2017 (L.I 2258) and other relevant laws. These legislations establish the procedures and requirements for exploration licence holders to progress towards development, including the criteria for declaring a discovery commercially viable.

In the case of the Eban-Akoma prospects, following the declaration of commerciality, a license holder is required to submit a formal robust Plan of Development (“PoD”) for onward determination and approval by the Minister for Energy and Green Transition1. The PoD must demonstrate that the project is technically feasible, economically sound, and socially responsible2. To date, engagement with the Petroleum Commission and the Ministry of Energy and Green Transition has proceeded in line with statutory expectations. The operators (partners) are expected to comply with data submission requirements, including seismic interpretations, well logs, flow test results, and economic evaluations. Pre-submission consultations with Petroleum Commission (the regulator) will also shape a development path that is technically sound, and policy aligned.

Of equal importance is compliance with Petroleum (Local Content and Local Participation) Regulations, 2013 (L.I. 2204)3. The Eban-Akoma project presents a renewed opportunity for enhanced Ghanaian participation in upstream activities ranging from procurement and fabrication to upstream services and training4. Legal provisions for environmental impact assessments are also being addressed, with preliminary scoping and stakeholder engagements already underway5.

The Eban-Akoma development is subject to a comprehensive Environmental Impact Assessment (EIA) process before the commencement of full field activities. This involves baseline environmental studies to establish current marine and coastal conditions, assessment of potential impacts from drilling and production operations, and the design of mitigation measures to minimize adverse effects6.

The regulatory process thus far reflects an alignment between state policy objectives and operator commercial interests. The timely declaration of commerciality will now serve as a trigger for the conversion of the exploration licence into a development and production lease, enabling the project to enter its execution phase.

Strategic and Policy Implications

At a national level, the commercialization of Eban-Akoma fits neatly into Ghana’s broader strategy of building a resilient and diversified petroleum economy. As maturing fields such as Jubilee and Tweneboa Enyenra Ntomme (TEN) Oil Field enter plateau and eventual decline, new discoveries are vital to sustaining production volumes and safeguarding state revenue.

The Government of Ghana has in recent years adopted a “hub-based” development model, encouraging operators to leverage existing infrastructure for new tiebacks. The Eban-Akoma fields are ideal candidates for this strategy, given their location near existing FPSOs and subsea systems. This infrastructure-sharing approach not only lowers development costs but also extends the economic life of existing assets.

In terms of revenue generation, production from Eban-Akoma is expected to contribute significantly to the Ghana Petroleum Holding and Stabilization Funds and the Annual Budget Funding Amount (ABFA), in line with the Petroleum Revenue Management Act, 2011 (Act 815). Early revenue inflows from this field could provide fiscal space for national infrastructure, health, road and education priorities.

There is also a strong local content opportunity. The commercial development of Eban-Akoma is expected to deepen the role of Ghanaian companies in the petroleum value chain and create skilled employment through the on-the-job training that partners are required to incorporate into their operations in Ghana. From fabrication yards in Takoradi to service companies and logistics hubs, the multiplier effect of commercial production will be felt across the economy7.

Strategically, the Eban-Akoma project also enhances Ghana’s positioning as a reliable hydrocarbon producer in West Africa. At a time when some international oil companies are reviewing their African portfolios, Ghana’s predictable policy environment and efficient regulatory regime send a positive signal to investors.

Challenges and Risks

While the economic and regulatory outlook is positive, several challenges remain. Aside from the oil curse which Ghana as a developing country is still struggling with, on the technical side, reservoir uncertainties such as compartmentalisation or pressure maintenance could affect ultimate recovery and project economics. Continued appraisal and early reservoir modelling will be key to de-risking development.

On the commercial front, price volatility remains a core concern. Although the field’s break-even is competitive, prolonged low oil prices or a rapid global energy transition could affect long-term profitability. Project proponents must therefore factor in future carbon regulations and climate-related disclosures.

Regulatory delays or misalignment of stakeholder expectations could also introduce risk. The approval of the PoD and timely grant of the production lease require efficient coordination among regulators, communities, and the operator. Moreover, compliance with local content thresholds must be managed without undermining project efficiency.

Finally, community engagement poses both a risk and an opportunity. Without inclusive dialogue and benefit-sharing frameworks, local resistance could derail timelines. Operators must therefore adopt transparent social investment strategies aligned with community priorities.

Conclusion

With a strong economic foundation and a supportive legal framework, the Eban-Akoma discoveries are on course to transition from promising prospects to producing assets. Following the declaration of commerciality, the next major milestone will be the approval of the PoD and subsequent Final Investment Decision by the Ministry and the Regulator, and the partners. The development strategy is likely to follow a phased approach starting with early production via tiebacks and progressing towards full-scale exploitation based on reservoir performance. If timelines hold, first oil could be achieved within three to four years of PoD approval.

Long term, the successful commercialisation of Eban-Akoma may spur renewed exploration activity in adjacent blocks and deepen Ghana’s upstream ecosystem. It will also set a useful precedent for how technically sound and economically resilient projects can progress through Ghana’s regulatory framework in a transparent and efficient manner.

Source notes — PDF page 5

1Section 27 of Act 919 2Regulation 43(2) of Petroleum (Exploration and Production) (General) Regulations, 2018 L.I 2359

Source notes — PDF page 6

3Regulation 3 of L.I 2204 4Regulation 9(1) of L.1 2204 5Section 12 of the Environmental Protection Agency Act, 1994 (Act 490) 6Sections 73, 81 and 82 of Act 919

Source notes — PDF page 7

7Sections 60, 61 and 63 of Act 919

About this source

Transcribed from The Edfields Natural Resource Journal — September 2025, PDF pages 4–7. The original PDF retains the published layout, illustrations and references. Contributor roles are as printed in the publication.

Download document